ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR THE

station in katutura, windhoek, khomas region prepared by: nam geo-enviro solutions p.o. box 3343 windhoek tel/fax: +264(61) 402246 email: info@geoenvirosol prepared for: puma energy namibia pty (ltd) p.o.box 3594 windhoek tel: +264(61) 2994873 environmental assessment practitioner (eap) reviewed by: ms ndapanda hasholo mr

ENVIRONMENTAL MANAGEMENT PLAN FOR THE OPERATION AND MAINTENANCE OF VAN ECK COAL FIRED POWER STATION

Van Eck Power Station is a Coal-Fired Power Station which consists of four (4 generating units, each rated at 30 MW. Unit 1 and Unit 2were commissioned in 1972, while Unit 3 was commissioned in 1973 and Unit 4 in 1979. Van Eck power station is the

ENVIRONMENTAL MONITORING AND EVALUATION REPORT

The following environmental monitoring and evaluation report was compiled by Nam Geo-Enviro Solutions (NGS) on behalf of Puma Energy Namibia to assess the current

ENVIRONMENTAL ASSESSMENT

TITLE: Environmental Assessment for the Establishment and Operations of a Bulk Fuel Storage Facility at the Eros Airport in Windhoek, Khomas Region, Namibia APPLICATION NUMBER: APP - 0010370 AUTHORS: Miss. Ruth Nuujoma (EAP) CLIENT: Central Oil Namibia (Pty) Ltd REPORT STATUS: Final Environmental Assessment Report

Windhoek railway station

History. The first railway line to reach Windhoek was the one from Swakopmund, built between 1897-1902 during Imperial Germany''s colonial rule of German South West Africa 1914 this line was extended to Walvis Bay. The southern line from Lüderitz (built 1906) was connected via Keetmanshoop to Windhoek in 1912. In 1930 the eastern line to Gobabis

BULK FUEL STORAGE FACILITY OF VIVO ENERGY IN

update the existing environmental management plan (EMP) for the Vivo Energy bulk fuel storage facility (depot) for petroleum products in Windhoek. The updated EMP will be submitted to the

Battery storage power station

A battery storage power station, or battery energy storage system (BESS), is a type of energy storage power station that uses a group of batteries to store electrical energy. Battery storage is the fastest

ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR THE

service station in windhoek, khomas region prepared by: nam geo-enviro solutions p.o. box 3343 windhoek tel/fax: +264(61) 402246 email: info@geoenvirosol prepared for: puma energy namibia pty (ltd) p.o.box 3594 windhoek tel: +264(61) 2994873 environmental assessment practitioner (eap) reviewed by: ms ndapanda hasholo mr

OPERATIONS AND MAINTENANCE OF THE BULK STORAGE

ENGEN Namibia (Pty) Ltd (the Proponent) operates an existing bulk fuel storage facility in Windhoek (Figure 1-1). The facility for the receipt and distribution of petroleum products

Techno-economic and environmental assessment of renewable energy

Economic, environmental, and reliability assessment of distribution network with liquid carbon-based energy storage using multi-objective group teaching optimization algorithm J Clean Prod, 0959-6526, 404 ( 2023 ), Article 136811, 10.1016/j.jclepro.2023.136811

REPUBLIC OF NAMIBIA NAMIBIA''S ENVIRONMENTAL

The Environmental Assessment (EA) policy was developed and refined through a lengthy process of cross sectoral and multi-disciplinary consultation and negotiation.

ENVIRONMENTAL ASSESSMENT

BULK FUEL STORAGE FACILITY AT THE EROS AIRPORT IN WINDHOEK, KHOMAS REGION NAMIBIA APPLICATION NO.: 0010370 FINAL ENVIRONMENTAL ASSESSMENT REPORT SEPTEMBER 2022 Prepared for: Central Oil (Pty) Ltd

Environmental Management

The Unit reviews and provides environmental guidance to applications to ensure environmental protection, compliance to environmental legislations and sustainability of

ENVIRONMENTAL MONITORING AND EVALUATION REPORT

Detailing environmental impacts of the existing facilities, assessment of existing controls and recommendations for environmental management to ensure the project continues

ENVIRONMENTAL ASSESSMENT FOR UPGRADING AND

ENVIRONMENTAL ASSESSMENT FOR UPGRADING AND RENOVATIONS FOR THE FLEET MANAGEMENT FUEL STATION FOR CITY OF WINDHOEK, KHOMAS REGION, NAMIBIA OPERATIONAL ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN (ESMP) JANUARY 2024 Prepared by: Namibia Environmental Consultants Postal Address: PO

SCOPING REPORT: ENVIRONMENTAL IMPACT

Environmental Assessment and Environmental Management Plan for the construction and operations of the proposed fuel retail facility on Erf 8002, Windhoek: c/o Wika and Sean McBride Street, (Figure 1). The construction of the proposed development has following phases: construction, operations and possibly decommissioning.

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT October 2021 PROPONENT: Erongo Liquid Petroleum Gas Terminal (Pty) Ltd PROPOSED: STORAGE PLANT OF LIQUID PETROLEUM GAS TERMINAL at Portion Remainder farm 39, Walvis Bay-Namibia. EAP: Consultant: Centre for Geosciences Research cc 128 A Bach street Windhoek

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT FOR THE ESTABLISHMENT AND OPERATION OF A BULK FUEL STORAGE FACILITY AT THE EROS AIRPORT IN WINDHOEK, KHOMAS REGION NAMIBIA APPLICATION NO.: 0010370 FINAL ENVIRONMENTAL ASSESSMENT REPORT SEPTEMBER 2022 Prepared for: Central Oil (Pty) Ltd Postal Address: PO Box

ENVIRONMENTAL IMPACT ASSESSMENT FOR:

Otjimbingwe Service Station is planned for a parcel of land situated on Erf 266 Otjimbingwe GPS Position: -22.3578414S 016.12812E. The envisioned project entails the construction of a standard service station with 2 dispensing pumps (petrol and diesel) with 2 double walled Underground Storage Tanks of 45 cubic meters.

ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR THE PROPOSED NEW BULK FUEL STORAGE FACILITY IN WALVIS BAY, NAMIBIA The Environmental Impact Assessment and Environmental Management Plan submitted is sufficient as it made an adequate provision of the environmental management concerning the proposed

PROJECT PROPONENT

Namibia''s Environmental Assessment Policy of 1995, the Environmental Management Act No. 7 of 2007, Government Notice No. 29 of 2012 (Listed Activities) and the Government Notice No. 30 of 2012 (EIA Regulations). 2.2 EMP SCOPING REPORT

ENVIRONMENTAL MANAGEMENT PLAN FOR THE

Environmental Clearance Certificate (ECC) being obtained. Pachyderm Environmental Consultants cc has been appointed to carry out the required Environmental Impact Assessment (EIA) study and apply for the ECC. 1.2. Purpose of the EMP EMP is an environmental tool used to minimize or prevent undue or reasonably

ENVIRONMENTAL MONITORING AND EVALUATION REPORT

puma eros service station in eros, windhoek, khomas region consultant: nam geo-enviro solutions p.o. box 3343 windhoek tel/fax: +264(61) 402246 email: info@geoenvirosol proponent: puma energy namibia pty (ltd) p.o.box 3594 windhoek tel: +264(61) 2994873 environmental assessment practitioner (eap) reviewed by: ms ndapanda hasholo

ENVIRONMENTAL MANAGEMENT PLAN FOR THE

at 30 MW. Unit 1 and Unit 2were commissioned in 1972, while Unit 3 was commissioned in 1973 and Unit 4 in 1979. Van Eck power station is the second largest power generating station for Namibia Power Corporation (NamPower) after Ruacana Power Station. The station is recognizable by its two 103 meters high smokestacks or chimneys.

Explosion hazards study of grid-scale lithium-ion battery energy storage station

1. Introduction Electrochemical energy storage technology has been widely used in grid-scale energy storage to facilitate renewable energy absorption and peak (frequency) modulation [1].Wherein, lithium-ion battery [2] has become the main choice of electrochemical energy storage station (ESS) for its high specific energy,

ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR THE

Puma Energy Namibia Pty (Ltd) intends to regularize the operation of existing Munitenge service station in accordance with the Environmental Management Act No. 7 of 2007,

Initial Environmental Examination (Update)

CEMP Construction Environmental Management Plan CES Central Energy System CITES Convention on International Trade in Endangered Species CRA Climate Risk Assessment DEIA Detailed Environmental Impact Assessment EA Executing Agency EARF Environmental Assessment and Review Framework EHS Environment, Health and Safety

NamPower

ANIXAS, a 22.5MW power station, is situated adjacent to the existing Paratus Power Station and will provide an emergency standby electrical capacity of 22.5 MW to Namibia. The construction of the power station ANIXAS started in December 2009 and took 19 months to complete. It was commissioned by the President of Namibia, His Excellency

APP-002662 EXISTING BULK STORAGE FACILITY AND FILLING

update their environmental management plan (EMP) for their existing liquefied petroleum gas (LPG) bulk storage facility and filling operations, GasIt, in the Southern Industrial

ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR THE

station, windhoek, khomas region prepared by: nam geo-enviro solutions p.o. box 3343 windhoek tel/fax: +264(61) 402246 email: info@geoenvirosol prepared for: puma energy namibia pty (ltd) p.o.box 3594 windhoek tel: +264(61) 2994873 environmental assessment practitioner (eap) reviewed by: ms ndapanda hasholo mr zeeuw mukuve

ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR THE

operation of the existing puma klein windhoek service station in windhoek, khomas region prepared by: nam geo-enviro solutions p.o. box 3343 windhoek tel/fax: +264(61) 402246 email: info@geoenvirosol prepared for: puma energy namibia pty (ltd) p.o.box 3594 windhoek tel: +264(61) 2994873 environmental assessment practitioner (eap)

Assessment of Atmospheric Dispersion of Fly Ash within the Vicinity of Van Eck Coal-Fired Power Station, Windhoek

The Van Eck Power Station is the oldest and only coal-fired plant in Namibia that is located at the outskirts of Windhoek. The power plant produces electricity from the combustion of coal. Its refurbishment began in 2013, to improve its efficiency and allow for longer operational period.

ENVIRONMENTAL MONITORING AND EVALUATION REPORT

The following environmental monitoring and evaluation report was compiled by Nam Geo-Enviro Solutions (NGS) on behalf of Puma Energy Namibia to assess the current environmental conditions on site and to apply for an ECC for the continuous operations of the existing Soweto service station in Windhoek.

NamPower

Van Eck is situated in the Northern Industrial area of Windhoek easy recognisable with it''s two 103 meters high smokestacks or chimneys. It''s 1 615 meters above sea level with an atmospheric pressure of 825 mbar. The first two Units were commissioned in 1972, the third in 1973 and the fourth in 1979. Van Eck was the first

APP-00716 OPERATIONS OF ETUNDA SERVICE STATION

Act No. 1 of 2015, Government Notice No. 86 of 2015. Provides a framework for a structured more uniform public and environmental health system, and for incidental matters. Deals with Integrated Waste Management including waste collection disposal and recycling; waste generation and storage; and sanitation.

Environmental Noise Guideline

Compliance with the sound level limits is required for existing, planned, new, expanded, or modified stationary sources of sound through an Environmental Compliance Approval issued under Part II.1 of the Environmental Protection Act, or a Renewable Energy Approval issued under section 47.3 of the Environmental

Environmental Noise Guideline

B7.3 Sound Level Limits for Emergency Equipment The sound level limits for noise produced by emergency equipment operating in non-emergency situations, such as testing or maintenance of such equipment, are 5 dB greater than the sound level limits otherwise applicable to stationary sources, described in Sections B7.1 and B7.2.

Power-to-What? – Environmental assessment of energy storage systems

– Environmental assessment of energy storage systems A. Sternberg and A. Bardow, Energy Environ. Sci., 2015, 8, 389 DOI: 10.1039/C4EE03051F To request permission to reproduce material from this article, please go to

Numerical and experimental assessment of the water discharge segment in a pumped-storage power station

Parameter analysis and performance optimization for the vertical pipe intake-outlet of a pumped hydro energy storage station Renew Energy, 162 ( 2020 ), pp. 1499 - 1518, 10.1016/j.renene.2020.07.135

CONTACT

Send your query

Taking customer satisfaction as all purposes is BSNERGY’s unremitting pursuit. Therefore, BSNERGY strives to make every customer feel sincere care and professional services to achieve win-win development.

contact
ADDRESS

Fengxian Distric,Shanghai

CALL FOR QUERY

SEND US MESSAGE

OPENING HOURS

09:00 AM - 17:00 PM

Copyright © BSNERGY Group -Sitemap